Rostov nuclear power plant: the power unit No. 4 is switched on in a network after end planned repairs

@ADVIS.RU
Show original
On September 16, 2019 at 05:12 (Moscow time) the power unit No. 4 of the Rostov nuclear power plant is switched on in a network after end scheduled preventive repairs (PPR *). Within September 16, 2019 at 05:12 (Moscow time) the power unit No. 4 of the Rostov nuclear power plant is switched on in a network after end scheduled preventive repairs (PPR *). Within...
Analysis
×
Yvan Pavlovich Malakhov
Last position: Chairman (Interstate Council on exhibition and fair and congress activity of CIS)
Gorbunov Andrey