To Smolensk Region passed doctrines

Show original
Smolensk Region passed doctrines in a power supply system within preparation for the autumn winter to the period (AWP). The dispatching personnel of Smolensk RDU, operation personnel of branch Branch Open joint-stock company "Interregional grid distribution company center" - "Belgorodenergo" – "JSC "Smolenskenergo"", operation personnel of the Vyazma distance of power supply "Transenergo" – RZhD branch Open joint-stock company "Rossiyskiye zheleznyye dorogi", local governments "the Safonovsky area" Smolensk Region...