It is required by 15 billion rubles to Izhevsk on repair water supply networks

Show original
15 billion rubles it is required to Izhevsk on repair and reconstruction of networks of water supply and water disposals...
Analysis
×
Igor Shuvalov
Last position: Chairman (SC Vnesheconombank)
46
Bekmemetyev Oleg
SC Vnesheconombank
Main activity:Finance
172