Rostov nuclear power plant: the power unit No. 4 is removed in scheduled preventive repair

@RusCable.Ru
Show original
The power unit No. 4 of the Rostov nuclear power plant is removed in standard planned capital repairs (PPR) *. Within the repair companies capital repairs the reactor installation (RI) with full unloading of heatallocating assemblies (TVS) from an active zone are planned. And also repair...
Analysis
×
Yvan Pavlovich Malakhov
Last position: Chairman (Interstate Council on exhibition and fair and congress activity of CIS)
Gorbunov Andrey
State corporation "Rosatom"
Main activity:Production and distribution of the electric power, gas and water
457
JOINT-STOCK COMPANY "KONTSERN ROSENERGOATOM"
Main activity:Production and distribution of the electric power, gas and water
18