Movement of cars on the bridge through a ship canal will limit almost for 4 months

Show original
Automobile transports on the bridge through a ship canal in Volgodonsk will partially limit movement until the end of October. As reported in Mintrans regiona, repair the bridge through a ship canal will be made from July 9 to October 31. In eton the period movement automobile transports on the bridge will be carried out on one strip. Novy Bridge through a ship canal opened in 1996. Extent of the bridge made 185 meters, height - 18 meters. Designs of the old bridge built in the 50th years were dismantled later. In the same time repair the bridge through the Seversky Donets will be made on...