To Volgograd Region started construction the gas pipeline in Leninsky Mar the area

Show original
The gas pipeline 2,6 km long started building from Zaplavny's village to the settlement the Eighth Leninsky Mar the area in which already lay local networks with a general extent of 5,7 km...
Analysis
×
Andrey Bocharov
Last position: Governor (Administration of the Volgograd region)
35
Zubkova Tatyana
Leninsky Mar
PJSC Gazprom
Main activity:Production and distribution of the electric power, gas and water
384