It is required to 370 billion rubles on a network for the BAM expansion and the Trans-Siberian Railway

Show original
Background: Modernization of 41 objects of infrastructure is planned for Branch JSC "RZHD" - East Siberian railroad in 2023 Construction the main power supply networks for power supply East range of Open joint-stock company "Rossiyskiye zheleznyye dorogi" will demand about 370 billion rubles of investments. Such statement was made by the deputy head Ministry of Energy of the Russian Federation Eugenie Petrovich Grabchak at meeting in Council of Federation of the Federal Assembly of the Russian Federation, transfers information agency "ITAR-TASS" (18%2B). About it reports information agency "IrkutskMedia" ". On construction the main power lines it is required to us about 370 billion rubles, on investments in objects of generation — about 470 billion rubles and on actions in distributive networks — about 11 billion rubles" —...