Deliveries gas on "Turetsky potok" will suspend on June 5 — 12

Show original
Moscow, 23 Mar — the PRIME. Deliveries gas on "Turetsky potok" will suspend from June 5 to June 12 in connection with annual planned servicing, gas transmission operators reported Hungary (FGSZ) and Bulgaria (Bulgartransgaz). Transportation of gas last year stopped from June 21 to June 27. "Turetsky potok" – the gas pipeline from Russian Federation through the Black Sea. Design capacity makes 31,5 billion cubic meter of gas a year. "Turetsky potok" is intended for supply of gas to Turkey and transit through the Turkish territory to the countries Southern Europe and Southeast Europe...