Marat Khusnullin: The sliding of a flying structure of the bridge through the Sura River on the route M-12] is complet
Builders finished one of the main stages of construction of the bridge through the Sura River on the route M-12 – a sliding of a flying structure, the Deputy Prime Minister Marat Khusnullin reported. Transition will connect coast Nizhny Novgorod Region and Chuvash Republic...