Arktik of LNG 2 and Ob LNG plants it is planned to construct and bring to design capacity by 2029

@
Show original
Arktik of LNG 2 and Ob LNG plants it is planned to construct and bring to design capacity in 2024-2029. The Minister of Energy reported Russian Federation Nicholas Shulginov, transfers information agency "Interfaks". Photo: Arcticspg.ru by words Nicholas Shulginov, PUBLIC JOINT-STOCK COMPANY "NOVATEK" intends to finish construction complexes and to bring to design capacity "Arktik of LNG 2" and "the Ob LNG" for 2024-2029. The minister also added that the Russian branch of productions the liquefied natural gas seeks for development and to export expansion. "Yamal LNG" projects JSC "Yamalo-Nenets Autonomous Okrug SPG" ", Sakhalin Region 2" and "by Kriogaz Vysotsk" are already realized. "In an active stage...
Analysis
×
Nicholas Shulginov
Last position: Minister (Ministry of Energy of the Russian Federation)
29
PJSC Gazprom
Main activity:Production and distribution of the electric power, gas and water
474
PJSC Novatek
Main activity:Production and distribution of the electric power, gas and water
148
OJSC Yamal LNG
Main activity:Mining
27