The new high voltage line of 500 KV between substations Altay and Irtysh directly will connect power supply systems of Siberia and the Urals

Show original
The designed high voltage line becomes the second transit between OES of Siberia and OES of Ural passing the territory Kazakhstan. The power line of 500 kV Kurgan-Vityaz-Voskhod entered in 2015 became the first main network transit which has connected the Urals and Siberia directly...