Crews "PUBLIC JOINT-STOCK COMPANY "ROSSETI" the Center" and "PUBLIC JOINT-STOCK COMPANY "ROSSETI" the Center and Volga region" continue work in the round-the-clock mode

Show original
Operation personnel of 17 branches of the power companies are mobilized because of adverse weather conditions. In the round-the-clock mode continue work of power Bryansk Region, Belgorod Region, Vladimir Region, Voronezh Region, Ivanovo Region, Kaluga Region, Kostroma Region, Kursk Region, Lipetsk Region, Nizhny Novgorod Region, Oryol Region, Tambov Region, Ryazan Region, Smolensk Region, Tula Region, Yaroslavl Region and Tver Region. At present elimination of the technological violations put to electronetwork infrastructure with a powerful cyclone, a being accompanied sleet, a gusty wind and a sleet proceeds. Employees "PUBLIC JOINT-STOCK COMPANY "ROSSETI" Center" and "PUBLIC JOINT-STOCK COMPANY "ROSSETI"...
Analysis
×
PJSC Rosseti
Main activity:Production and distribution of the electric power, gas and water
218
Belgorod region
Regional center
516
Voronezh region
Regional center
465
Tula region
Regional center
383
Tver region
Regional center
426
Kursk region
Regional center
387