In Anapa continue to equip drainage channels

@
Show original
Photo: Purely Anapa these days in Anapa proceeds arrangement of drainage channels. Experts stack drainage trays and a collector of 1200 mm down the street Ovrazhna. The channel originates near Anapskoye Highway, passes under the route and goes across Ovrazhnoy to Rodnikovy Drive, coming to an end at more smoothly. Now come to an end of work and in the village Anapa: there clean the course of the channel and stack pipes of bigger diameter, than were before. According to the Purely Anapa channel, storm ditches put in order in Pervomaisk the rural district. These works are conducted with the purpose in time...
Analysis
×
Dmitry Vasiliadi
Last position: Minister (Ministry of Transport and Road System of the Republic of Khakassia)
3