JSC <0> Transneft </0> – Siberia" prepared river fleet for navigation

Show original
JSC <0> Transneft – Siberia" finished preparation own water transport by the period of navigation of 2022. Water transport is applied to relocation of the vehicles, special equipment, processing equipment and material resources in remote for land deliveries places, and also for deliveries the personnel to a place of inspection of underwater transitions of the main oil pipelines. In structural divisions of the enterprise on watercrafts repair and maintenance knots and mechanisms, navigation equipment, means sound and light is carried out...