Bagayevsky water-engineering system: start is given to the second stage of construction

Show original
Contract the worth nearly 28 billion rubles is concluded between Azovo-Donskoy's administration of the pool of internal waterways and company "Stroytransgaz...
Analysis
×
Vladimir Okunev
Last position: Minister (Ministry for transport of the Rostov region)
YouTube
Manufactured by:Google
136