To Rostov Region started the second stage of construction the Bagayevsky water-engineering system

Show original
In Rotovsky area started the second stage of construction the Bagayevsky water-engineering system the Second stage of construction the Bagayevsky water-engineering system starts on Don. The head of Federal state-funded institution "Azovo-Donskaya basseynovaya administration" Sergei Konstantinovich Gaydaev, the correspondent economic branch portal "Rossiyskoye sudokhodstvo" reports. "The beginning of performance of the following works is planned for 2021. It is development working documentation, construction the rotational settlement, a protection and clearing of the territory of constructions, power line construction for providing rotational...
Analysis
×
Sergei Konstantinovich Gaydaev
Last position: Head (Federal state-funded institution "Azovo-Donskaya basseynovaya administration")
Vladimir Okunev
Last position: Minister (Ministry for transport of the Rostov region)