On Don the second stage of construction the Bagayevsky water-engineering system] begin
The state contract on construction the second stage of the Bagayevsky water-engineering system is signed. The price contracts – 27,9 billion rubles. Completion date – December, 2024. General contractor – JOINT-STOCK COMPANY "STROYTRANSGAZ". About it...