On Don the second stage of construction the Bagayevsky water-engineering system] begin

Show original
The state contract on construction the second stage of the Bagayevsky water-engineering system is signed. The price contracts – 27,9 billion rubles. Completion date – December, 2024. General contractor – JOINT-STOCK COMPANY "STROYTRANSGAZ". About it...
Analysis
×
Sergei Konstantinovich Gaydaev
Last position: Head (Federal state-funded institution "Azovo-Donskaya basseynovaya administration")
Vladimir Okunev
Last position: Minister (Ministry for transport of the Rostov region)