In Ukhta will disconnect hot water

Show original
In Ukhta on May 25-31 will pass city shutdown of hot water for tests of heating systems. Komi Republic branch PUBLIC JOINT-STOCK COMPANY "T PLUS" on the basis of the resolution of City administration since May 14 is finished by a heating season in Ukhta. Since May 25 in the city tests of thermal networks will begin: them will check on thermal and hydraulic losses, and then – on density and durability. For works, from May 25 to May 31, hot water supply in Ukhta will be suspended. Then throughout all interheating period local diagnostics and preventive repair sites of networks in different districts of the city will be made...
Analysis
×
Bobyr Victor
PUBLIC JOINT-STOCK COMPANY "T PLUS"
Main activity:Production and distribution of the electric power, gas and water
42
City administration
Government Agency