In Alikovo construction 25-meter swimming pools] came to the en

Show original
The new object is constructed at for children and young people to sports school "Helkhem" and connected to it warm transition. Construction began in May, 2020. About a course of works of "SCh" told earlier. For fans of sports, besides the 25-meter pool with four paths and locker rooms with shower, rooms for methodical and studies, a medical office and other administration premises are built a hall of "dry warm-up"...
Analysis
×
Vasilii Petrov
Last position: Minister (MINISTRY OF PHYSICAL EDUCATION AND SPORTS OF THE CHUVASH REPUBLIC)
2