On a construction site TsKAD will transfer routes of pipelines

Show original
FAU "Glavgosekspertiza Russia" considered presented repeatedly design and budget documentation on a reorganization of sites of gas pipelines "Voskresensk-KRP-11", "Voskresensk-KRP-16", and also oil pipelines for preparation of the territory of the fourth starting complex of construction the Central ring highways A-113. Following the results of carrying out the state examinations the positive conclusion is issued. The central ring highway A-113 becomes an important link transport systems the Moscow region. The high-speed highway which operation is planned on a paid basis, will pass in...

Full article is available at its source

Go to full article

Sign up for more features!

Get full access to news analytics for free and without ads.