Foreign vessels continue to work at "Nord Stream — 2"

@War
Show original
In spite of the fact that "preferential" term according to the American sanctions ended yesterday, foreign vessels continue to work at "Nord Stream — 2". However, it is a question of works which do not influence gas pipeline completion, but can influence safety already constructed site. The operator of the project Nord Stream 2 AG confirmed that construction works on "Nord Stream — 2" proceed...

Full article is available at its source

Go to full article

Sign up for more features!

Get full access to news analytics for free and without ads.

Persons
in this article
Donald Trump
Last position: President of the United States of America
Angela Merkel (Angela Merkel)
Last position: Federal chancellor (Government of Federative Republic of Germany)
Vladimir Putin
Last position: President of the Russian Federation
Alexander Novak
Last position: Minister (Ministry of Energy of the Russian Federation)
Myuller Jens
Organizations
in this article
PJSC Gazprom
Main activity:Production and distribution of the electric power, gas and water
Nord Stream 2 AG
Main activity:Production and distribution of the electric power, gas and water