Power engineering specialists Republic of Khakassia again in a mode of the increased readiness

Show original
To Republic of Khakassia a strong wind and a blizzard. All services PUBLIC JOINT-STOCK COMPANY "ROSSETI" Siberia to Republic of Khakassia are transferred to a mode of the increased readiness. According to Federal state-financed institution "Khakassky Tsgms", today on Republic of Khakassia the blizzard, places heavy snow remain very strong western wind with rushes from 25 to 35 meters per second. Let's remind, in October the gale, which separate rushes reached 30-35 m/s, caused damage to tens settlements Republic of Khakassia: brought down trees, beat out frames, hid roofs. In a number of areas on lines of the high voltage line support were damaged, wires are broken. In the Khakass branch PUBLIC JOINT-STOCK COMPANY "ROSSETI" Siberia are checked and ready to work...