The base of the first wind turbine of the second wind farm State corporation "Rosatom" - "Kochubeevsky VES"] is filled i
On October 18 on a platform of constructions VES took place a ceremony of filling of the base of the first wind turbine of the second wind farm State corporation "Rosatom" - "Kochubeevsky VES". The wind farm (VES) power 210MVt with planned annual development of 496,7 million kWh will appear in Kochubeevskoe district Stavropol Territory where 84 wind turbines will be installed on a site of 725187 square meters. Stavropol Territory Vladimir Vladimirov and the deputy director generals JOINT-STOCK COMPANY "NOVAVIND" Nesteruk Andrey the governor. By long tradition of builders power engineering specialists on start...