Filling with oil of the NPS reservoir park No. 27 of the second turn of ESPO] is complet
Open company" PUBLIC JOINT-STOCK COMPANY "TRANSNEFT" – Far East" finished filling with oil of reservoir park and technological pipelines of oil pumping station (NPS) No. 27 of the second turn of open company" PUBLIC JOINT-STOCK COMPANY "TRANSNEFT" – Far East" was finished by filling with oil of reservoir park and technological pipelines of oil pumping station (NPS) No. 27 of the second turn...