Construction of the bridge in Polar will begin in 2020

@Nord-News
Show original
This bridge was open for more than 70 years, but in 2014, after construction check, the decision to close a foot zone, in connection with danger of a collapse was made...

Full article is available at its source

Go to full article

Sign up for more features!

Get full access to news analytics for free and without ads.

Article analysis

×