PUBLIC JOINT-STOCK COMPANY "T PLUS" stops New and Sverdlovsk combined heat and power plant for repair

Show original
On carrying out actions will direct 137 millionovsverdlovskiya branch PUBLIC JOINT-STOCK COMPANY "T PLUS" started preparation of New and Sverdlovsk combined heat and power plant for winter. On repair campaign of power will direct to 137 million rubles. Works will be carried out from August 16 to August 28, for this period the station will be completely stopped. Experts will carry out the current repair gas-distributing point, the gas pipeline of a high pressure, gas flues of coppers, replacement and repair not switched-off fittings. For shutdown heatgenerating capacities of New and Sverdlovsk combined heat and power plant will be replaced with Sverdlovsk combined heat and power plant, the Sredneuralsk state district power station and the Gurzufsky boiler room...

Full article is available at its source

Go to full article
Connections Tree
Try it

Sign up for more features!

Get full access to news analytics for free and without ads.

Article analysis

×
Organizations
in this article
PUBLIC JOINT-STOCK COMPANY "T PLUS"
Main activity:Production and distribution of the electric power, gas and water