Power engineering specialists of "Permenergo" replaced grozotros with the high voltage line in Chastye district

Show original
Power engineering specialists of "Permenergo" increased reliability of power supply more than 40 settlements in Chastye district Perm Territory. To replacement was subject grozotros on a two-chain site of an air-line of an electricity transmission of 110 kV "Siva - the Hacksaw". The general extent of a site of the high voltage line on which works were carried out, made 3,6 km...